Commercial

Sports Facilities
Hospitals
Restaurants
Bathrooms
Offices
Gas Stations
Garages
Sports Facilities
Hospitals
Restaurants
Bathrooms
Offices
Gas Stations
Garages

At Happy Valley Concrete Coatings, we offer customized flooring solutions for various spaces, including restaurants, bathrooms, gas stations, offices, garages, and hospitals. We ensure minimal downtime and successful coating application every time through our wide range of coatings and industrial equipment. Our team works with you from start to finish to guarantee a smooth installation process and allows you to get back to business as quickly as possible.


We work with individual businesses and franchises for consistent, reliable and affordable commercial flooring solutions that last. Our team works with a wide variety of businesses, going above and beyond using true, reliable Amish craftsmanship to create a durable and attractive floor.


Proper floor preparation is a key step in a successful installation, and we have an extensive line of equipment to achieve this. Our equipment is designed to remove damaged or deteriorated concrete, open up porosity, and remove all chemicals and contaminants. The resulting coarse profile allows the coating to deeply penetrate the concrete, ensuring maximum adhesion.


Our installation process includes repair and restoration to the concrete where there may be minor cracks, pitting, or spalling. We provide concrete coating installation, concrete coating restoration and replacement to commercial clients across Carlisle, State College, Spring Mills, Harrisburg, Williamsport, Williamsburg, Mechanicsburg, Centre Hall, Mill Hall and beyond.

Guaranteed Benefits

Superior Product

As certified V-8 coating installers we can guarantee that we are using the superior concrete coating product your commercial business.

Expert Installation

You can be certain that your flooring will be properly installed with our certified and trained installation specialists.

Custom Colors & Style

Our concrete coating solutions are entirely customizable to your business. Whether you are seeking a sleek bathroom, a restaurant dining area that matches your branding or a functional kitchen. We have you covered.

Easy Cleaning

Our low-maintenance coating will keep your floors free of mold and mildew build-up.

OUR PROCESS

Substrate Preparation

At Happy Valley Concrete Coatings, we understand that proper concrete preparation is crucial to the success of your flooring installation. Our team will start by examining your floor’s density, hardness, moisture content, and structural condition to determine the best approach. We use the number one form of preparation in the coating industry, cleaning and levelling for the maximum adhesion and smooth finish.

Concrete Repair and Restoration

In the case of many floors, we have to use special menders and fillers to fix any pits, cracks, and/or spalls present in the existing concrete floor. This portion of the process includes grinding, mending and filling. We remove any deteriorated concrete and overfill it with our mender material. When the material is fully cured, we grind the overfilled material flush with the concrete surface.

Floor Coating Installation

We start by coating all vertical surfaces, including the concrete or block stem walls, steps, and walls as defined in the scope of the project. We mix and apply our base coat to the floor. The high solids content provides the strongest and most densely cross-linked product ensuring strength, durability, and longevity of the floor coating. Once the base coat is applied, your choice of polymer flake, metallic finish, quartz, solid color or clear is broadcast onto the floor, covering it fully. The drying period on our base coat is typically a 60-90 depending on the temperature and humidity the day of the install.

Once the basecoat is fully cured, if flake was chosen, we scrape the floor to remove any loose or vertically standing flakes. We then vacuum to recover any loose chips left behind on the floor.

Finally, we apply the clear topcoat with a squeegee and back and cross-roll to eliminate lines and leave an even clear coat over the entire floor. Texture can be added to the topcoat for added slip-resistance.
Share by: